This was a design/build project which
consisted of relocating the existing concrete batch
plant and erecting a steel building around it. Scope
of work included coordination during design phase, field
measuring existing plant as no drawings available, and
designing foundations and footings to support the plant.
Project also involved extensive site work coordination
for containment along with the wash out lagoon for recycled
water.
<<